Skip to main content

Go To Logistics, River Grove

Furnish and install two (2) 96” diameter CMP systems providing over 300,000 cubic feet of stormwater detention. The project also consisted of the installation of RCP storm piping from 12” – 42” diameter. Over 2,000’ of water main was installed with hydrants, valves and appurtenances along with a sanitary sewer and service for the new 220,000 square foot building.